Monday, 16 May 2011

DSDN project 3 Timeline(8/5/2011)-

I sketched out a time plan that I will be following when doing my stop motion video. The video itself is not hard to create but is a little time consuming. However it is still achievable to do in the time frame given for this project, as long as I actually do stick to the plan and take photos.
  14/5/2011- Begin test shots with lego peices at te aro and gathering the bits needed to start the film and what the layout will look like.
  15/5/2011- Begin to start photo shooting and starting with them on nero-vision.
  17/5/2011- prepare if asked to present progress and continue with photos for the film.
   20/5/2011- Continue with photos for film (including 21st and 22nd)
  23/5/2011- Begin to write up the 200-300 word description on my film (due 27th May).
  24/5/2011- Aim to have most of the photos completed and just touching up on the film.
  26/5/2011- have description ready to hand in.
  28/5/2011- touch up on film if need be and check everything is in order to present my film.
   —  31/5/2011- final presentation and exhibition start.

No comments:

Post a Comment